Mifa İnşaat

SIRLI SOLAR POWER PLANT

Employer: Fay-Ges Energy Inc.
Location: Aziziye, Erzurum
Date: 2018 - Ongoing

All maintenance and operation activities of the solar plant with 1,14 MW installed power, with 1.723.000 kWh electricity production capacity, equivalent to the energy need of 550 residences, is conducted by us.